Oil Discharged with Produced Water 1991 to 2003

A mixture of oil, water and gas is produced from reservoirs and these components are usually separated in the production train. However, not all the oil can be removed from the water and as a result a small quantity of oil will be discharged with the produced water.

The discharge of oil-contaminated produced water from offshore installations is permitted by an exemption granted under POPA, and the oil content must not exceed 40 parts per million. It has proved to be difficult for a few installations; in particular those operating in mature fields, to meet this target. In 2002 of 74 installations discharging produced water, 3 exceeded this target when averaged over the whole year. The average content of oil in produced water for the year, for the UKCS as a whole, was 21 parts per million. This is in line with previous years figures and remains the lowest value yet recorded in the UKCS.

Recent improvements in produced water management have been maintained. The improvements in this area are an achievement for the offshore oil industry as the amount of water produced with oil increases as fields mature. This highlights the considerable efforts being made by both Government and industry in minimising the oil in produced water discharges. Each installation's produced water discharge is different and as such there is no single solution to reducing the oil discharges.

Table 3.2 Oil Discharge with Produced Water 1991 - 2003

  1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003
Number of Installations Permitted to Discharge Oil 39 43 46 52 55 60 64 64 73 68 74 74 85
Total Water Discharged (million tonnes) 153 135 148 147 192 210 234 253 261 244 261 272 266
Total Oil Discharged (tonnes) 5490 4850 4232 4418 5855 5706 5767 5692 5641 5395 5613 5590 5190
Average Oil in Water Content (mg/kg) 35 36 28 30 30 27 25 22 22 22 21 21 20

This data was last updated on : July 2004 and is due to be updated on : May 2005

If any errors are found or if you have any comments or other queries please contact:

Hazel Brodie
email: hazel.brodie@dti.gsi.gov.uk

phone: +44 (0) 1224 254027
fax: +44 (0) 1224 254018


Back | Title | Table of Contents
Appendix 1 | Appendix 2 | Appendix 3 | Appendix 4 | Appendix 5 | Appendix 6 | Appendix 7 | Appendix 8 | Appendix 9
Appendix 10 | Appendix 11 | Appendix 12 | Appendix 13 | Appendix 14 | Appendix 15 | Appendix 16 | Appendix 17
Index Map | Plate 1 | Plate 2W | Plate 2E | Plate 3W | Plate 3E | Plate 4W | Plate 4E | Plate 5 | Plate 6
Plate 7 | Plate 8W | Plate 8E | Plate 9W | Plate 9E | Plate 10W | Plate 10E | Plate 11 | Plate 12 | Legend