Deveron

(BP-Amoco)

Offshore oil field in production.

Block and licence number:

211/18a, P.236

Map reference:

Plate 6

Grid reference:

1° 31’ E 61° 22’ N

Licensees and company interest in block (%) at end of 2001:

Britoil plc

81.72

Conoco (U.K.) Theta Ltd

18.28

Date of discovery:

September 1972

Production start:

September 1984

Operator’s estimate of:

 

Recoverable reserves originally present (million tonnes):

2.13

First year of peak production:

1986

Peak production (million tonnes per year):

0.31

Water depth:

162m

Gravity:

38º API

Sulphur content:

0.32%

Transport system:

Oil and NGLs co-mingled with Thistle’s are piped to Sullom Voe.

Extension into other UK blocks:

None