Crosby Warren

(Edinburgh Oil & Gas)

Onshore oil field in production.

Block and licence number:

L46/12, DL.001

Map reference:

Plate 12

Grid reference:

0° 37’ W 53° 36’ N

Licensees and company interest in block (%) at end of 2000:

Edinburgh Oil & Gas plc

100.00

Date of discovery:

May 1986

Production start:

October 1987

Operator’s estimate of:

 

Recoverable reserves originally present :

Oil: (million tonnes) 0.062
Gas: (billion cubic metres) 0.007

First year of peak production:

1987

Peak production (million tonnes per year):

0.0165

Gravity:

40.8º API

Sulphur content:

Nil

Transport system:

Road tanker to intermediate storage depot.

Extension into other UK blocks:

None