| Clyde |
(Talisman) |
| Offshore oil field in production. |
|
| Block and licence number: |
30/17b, P.266 |
| Map reference: |
|
| Grid reference: |
2° 17’ E 56° 27’ N |
| Licensees and company interest in block (%) at end of 2001: |
|
| Talisman Energy (UK) Ltd. |
95.00 |
| First Oil Expro Limited. |
5.00 |
| Date of discovery: |
June 1978 |
| Production start: |
March 1987 |
| Operator’s estimate of: |
|
| Recoverable reserves originally present (million tonnes): |
17.98 |
| First year of peak production: |
1988 |
| Peak production (million tonnes per year): |
2.5 |
| Water depth: |
81m |
| Gravity: |
37.5º API |
| Sulphur content: |
0.40% |
| Transport system: |
Oil piped to Fulmar for export to Teesside via the Norpipe system. Associated Gas piped to Fulmar and then to St. Fergus via the Fulmar gas line. |
| Extension into other UK blocks: |
30/16 waiver in place. Commercial depletion possible. |