Calow

(Caribe)

Onshore gas field under development.

Block and licence number:

LK/24, PL 213

Map reference:

Plate 12

Grid reference:

1° 23’ W 53° 14’ N

Licensees and company interest in block (%) at end of 2001:

Caribe Natural Gas Ltd

100.00

Date of discovery:

January 1965

Production start:

(Expected) September 2001

Operator’s estimate of:

 

Recoverable reserves originally present (billion cubic metres):

0.046

First year of peak production:

2001

Peak production (billion cubic metres per year):

0.007

Transport system:

Gas used on site at Chesterfield Hospital.

Extension into other UK blocks:

None

Remarks:

Gas used and sold to NHS Chesterfield Hospital for CHP