| Calow |
(Caribe) |
| Onshore gas field under development. |
|
| Block and licence number: |
LK/24, PL 213 |
| Map reference: |
|
| Grid reference: |
1° 23’ W 53° 14’ N |
| Licensees and company interest in block (%) at end of 2001: |
|
| Caribe Natural Gas Ltd |
100.00 |
| Date of discovery: |
January 1965 |
| Production start: |
(Expected) September 2001 |
| Operator’s estimate of: |
|
| Recoverable reserves originally present (billion cubic metres): |
0.046 |
| First year of peak production: |
2001 |
| Peak production (billion cubic metres per year): |
0.007 |
| Transport system: |
Gas used on site at Chesterfield Hospital. |
| Extension into other UK blocks: |
None |
| Remarks: |
Gas used and sold to NHS Chesterfield Hospital for CHP |