| Callisto |
(Conoco) |
||||||||
| Offshore gas field in production. |
|||||||||
| Block and licence number: |
49/22, P.025 |
||||||||
| Map reference: |
|||||||||
| Grid reference: |
2° 21’ E 53° 14’ N |
||||||||
| Licensees and company interest in block (%) at end of 2001: |
|||||||||
| Superior Oil (UK) Ltd |
50.00 |
||||||||
| Conoco (UK) Ltd |
20.00 |
||||||||
| Statoil (UK) Ltd |
30.00 |
||||||||
| Date of discovery: |
February 1990 |
||||||||
| Production start: |
October 1995 |
||||||||
| Operator’s estimate of: |
|||||||||
| Recoverable reserves originally present (billion cubic metres): |
2.20 |
||||||||
| First year of peak production: |
1995 |
||||||||
| Peak production (billion cubic metres per year): |
0.47 |
||||||||
| Water depth: |
33.50m |
||||||||
| Transport system: |
Subsea to Ganymede, Pipeline to LOGGS and Theddlethorpe. |
||||||||
| Extension into other UK blocks: |
Block number, licence number and licensee/company interest in block (%) at end of 2000: 49/23, P.016
|
||||||||