Buchan

(Talisman)

Offshore oil field in production.

Block and licence number:

21/1a, P.241

Map reference:

Plate 8

Grid reference:

0° 00’ E 57° 54’ N

Licensees and company interest in block (%) at end of 2000:

Talisman Energy (UK) Ltd

71.10

Talisman North Sea Ltd

2.27

Transworld Petroleum (UK) Ltd

12.71

EDC (Europe) Ltd

13.01

First Oil Expro. Ltd

0.91

Date of discovery:

August 1974

Production start:

May 1981

Operator’s estimate of:

 

Recoverable reserves originally present (million tonnes):

20.30

First year of peak production:

1983

Peak production (million tonnes per year):

1.60

Water depth:

111.40m

Gravity:

33.5º API

Sulphur content:

1.57%

Transport system:

Oil and NGLs transported by pipeline to Cruden Bay via the Forties System.

Extension into other UK blocks:

Extension into other UK blocks:

Block number, licence number and licensee/company interest in block (%) at end of 2000:

20/5a, P.294

Talisman Energy (UK) Ltd 100.00

Remarks:

Floating production facility with gas lift and pipeline export.