| Brae Central |
(Marathon) |
| Offshore oil field in production. |
|
| Block and licence number: |
16/07, P.108 |
| Map reference: |
|
| Grid reference: |
1° 18’ E 58° 45’ N |
| Licensees and company interest in block (%) at end of 2001: |
|
| Marathon Oil (UK) Ltd. |
38.00 |
| BP Exploration Operating Co. Ltd. |
20.00 |
| Talisman Energy (UK) Ltd. |
14.00 |
| Kerr- McGee Oil (UK) plc |
8.00 |
| BG International Ltd. |
7.70 |
| Burlington Resources (UK) Inc. |
6.30 |
| Lundin North Sea Limited. |
4.00 |
| Agip (UKCS) Ltd. |
2.00 |
| Date of discovery: |
South accumulation: July 1977 |
| Production start: |
South accumulation: July 1983 |
| Operator’s estimate of: |
|
| Recoverable reserves originally present: |
South accumulation: (million tonnes) 40.00 |
| First year of peak production: |
South accumulation: 1985 |
| Peak production (million tonnes per year): |
South accumulation: 5.00 |
| Water depth: |
South accumulation: 112m |
| Gravity: |
South accumulation: 33/35º API |
| Sulphur content: |
South accumulation: 0.64% |
| Transport system: |
Oil and NGLs piped to Cruden Bay via Forties. Gas exported via SAGE System to St Fergus. |
| Extension into other UK blocks: |
16/7b, P.340 Companies as above |