| Boulton |
(Conoco) |
| Offshore gas field in production. |
|
| Block and licence number: |
44/21a, P.450 |
| Map reference: |
|
| Grid reference: |
2° 08’ E 54° 14’ N |
| Licensees and company interest in block (%) at end of 2000: |
|
| Conoco (UK) Ltd |
46.00 |
| GDF Britain Ltd |
44.50 |
| Tullow Exploration Ltd |
9.50 |
| Date of discovery: |
November 1984 |
| Production start: |
December 1997 |
| Operator’s estimate of: |
|
| Recoverable reserves originally present : |
Gas: (billion cubic metres) 4.47 |
| First year of peak production: |
1998 |
| Peak production (billion cubic metres per year): |
0.93 |
| Water depth: |
37m |
| Transport system: |
Pipeline to Theddlethorpe via Murdoch and CMS. |
| Extension into other UK blocks: |
None |