| Blenheim |
(Talisman) |
||||||
| Offshore oil field ceased production. |
|||||||
| Block and licence number: |
16/21b, P.344 |
||||||
| Map reference: |
|||||||
| Grid reference: |
1° 00’ E 58° 16’ N |
||||||
| Licensees and company interest in block (%) at end of 2000: |
|||||||
| Talisman North Sea Ltd |
60.00 |
||||||
| Summit North Sea Oil Ltd. |
40.00 |
||||||
| Date of discovery: |
November 1990 |
||||||
| Production start: |
March 1995 |
||||||
| Last production: |
April 2000 |
||||||
| Operator’s estimate of: |
|||||||
| Recoverable reserves originally present (million tonnes): |
2.67 |
||||||
| First year of peak production: |
1995 |
||||||
| Peak production (million tonnes per year): |
1.36 |
||||||
| Water depth: |
148m |
||||||
| Gravity: |
39º API |
||||||
| Sulphur content: |
Nil |
||||||
| Transport system: |
Shuttle tankers. |
||||||
| Extension into other UK blocks: |
Block number, licence number and licensee/company interest in block (%) at end of 2000: 15/25c, P.735
|
||||||
| Remarks: |
Three subsea wells tied back via individual risers to a Floating Production, Storage and Offtake (FPSO) system. |
||||||