| Baird |
(BP-Amoco) |
| Offshore gas field in production. |
|
| Block and licence number: |
49/23, P.016 |
| Map reference: |
|
| Grid reference: |
2° 31’ E 53° 06’ N |
| Licensees and company interest in block (%) at end of 2000: |
|
| Amoco UK Petroleum Ltd |
30.77 |
| BG International Ltd |
30.77 |
| Amerada Hess Ltd |
23.08 |
| Enterprise Oil plc |
15.38 |
| Date of discovery: |
September 1993 |
| Production start: |
December 1993 |
| Operator’s estimate of: |
|
| Recoverable reserves originally present : |
Gas (billion cubic metres): 3.14 |
| First year of peak production: |
1993 |
| Peak production (billion cubic metres per year): |
0.35 |
| Water depth: |
31m |
| Transport system: |
Pipeline to Bacton. |
| Extension into other UK blocks: |
None |