Audrey

(Conoco)

Offshore gas field in production.

Block and licence number:

49/11a, P.028

Map reference:

Plate 10

Grid reference:

2° 00’ E 53° 33’ N

Licensees and company interest in block (%) at end of 2001:

Conoco Limited

30.79

Roots Gas Limited

36.53

Venture Production (North Sea Developments) Limited

29.90

BG International Limited

2.78

Date of discovery:

March 1976

Production start:

October 1988

Operator’s estimate of:

 

Recoverable reserves originally present :

Gas (billion cubic metres): 19.57
Oil: (million tonnes): 0.30

First year of peak production:

1990

Peak production (billion cubic metres per year):

2.40

Water depth:

27m

Transport system:

By pipeline into the LOGGS system for separation before onward transmission to Conoco’s Theddlethorpe processing plant.

Extension into other UK blocks:

Block number, licence number and licensee/company interest in block (%) at end of 2000:

48/15a, P.130

Conoco Ltd

50.00

Centrica Resources Ltd

50.00

Remarks:

Sale of Phillip’s equity effective 1st October 2000. Sale completion expected Q2 2001. Not normally manned platforms controlled from Conoco’s LOGGS complex.