| Andrew |
(BP - Amoco) |
||||||||
| Offshore oil field in production. |
|||||||||
| Block and licence number: |
16/28, P.092 |
||||||||
| Map reference: |
|||||||||
| Grid reference: |
1° 25’ E 58° 03’ N |
||||||||
| Licensees and company interest in block (%) at end of 2001: |
|||||||||
| Britoil Public Limited Company |
62.75 |
||||||||
| Lasmo (TNS) Limited |
16.21 |
||||||||
| MOC Exploration (UK) Limited |
11.18 |
||||||||
| Kerr-McGee Andrew Limited |
6.66 |
||||||||
| Talisman Energy (UK) Limited |
3.20 |
||||||||
| Date of discovery: |
June 1974 |
||||||||
| Production start: |
June 1996 |
||||||||
| Operator’s estimate of: |
|||||||||
| Recoverable reserves originally present: |
Oil: (million tonnes) 20.00 |
||||||||
| First year of peak production: |
1997 |
||||||||
| Peak production (million tonnes per year): |
2.65 |
||||||||
| Water depth: |
117m |
||||||||
| Gravity: |
40°API |
||||||||
| Sulphur content: |
Nil |
||||||||
| Transport system: |
Oil pipeline to Brae-Forties. Gas pipeline to Everest-CATS. |
||||||||
| Extension into other UK blocks: |
Block number, licence number and licensee/company interest in block (%) at end of 2000: 16/27a, P.225
|
||||||||